原文传递 Guide for the Porcess of Managing Risk on Rapid Renewal Projects. The Second Strategic Highway Research Project
题名: Guide for the Porcess of Managing Risk on Rapid Renewal Projects. The Second Strategic Highway Research Project
作者: Molenaar, K.; Loulakis, M.; Ferragut, T.
关键词: Risk management##Rapid renewal projects##Guidelines##Constuction##Highway projects##Material implementation##Training##Risk identification##Risk assessment##Project performance##Management and planning##Transportation planning##
摘要: In the past, many transportation projects have performed poorly (e.g., in terms of ultimate cost and schedule to completion), often because of unexpected problems. This might be amplified for rapid renewal projects, which are intended to accelerate schedule and minimize disruption through construction, without adversely affecting either costs through construction or postconstruction longevity. By definition, these rapid renewal methods typically are innovative, with little past experience from which to learn, and possibly more susceptible to poor performance. This guide presents a formal risk management process to better understand and to actually optimize project performance specifically for rapid renewal projects, especially by anticipating and planning for potential problems (risks) and potential improvements (opportunities). This process, which is a significant expansion of a previously developed risk management process for nonrapid renewal projects (for which the expanded process is also applicable), consists of a well-defined series of steps, each of which has been described in appropriate detail, including possible variations. Sufficient guidance is also provided to ensure compatibility and consistency among the various steps, and ultimately to ensure adequate accuracy and defensibility of results (where adequacy depends on how the results will be used), as efficiently as possible.
总页数: 373
报告类型: 科技报告
检索历史
应用推荐