The bridge of the future is likely to be constructed of lighter and more durable high- performance materials, which will lead to more concern about storm surges sweeping the deck off the foundations as occurred on I-10 during the 2004/2005 hurricane season. The proposed study utilizes high tech force measurement techniques to derive drag, lift, and moment coefficients for inundated bridge decks for a variety of approach flow conditions.
状态:
Active
资金:
0.00
资助组织:
Federal Highway Administration
项目负责人:
Duwadi, Sheila
开始时间:
20080000
实际结束时间:
20080800
主题领域:
Bridges and other structures;Highways;I30: Materials