项目名称: |
Validation of Assessment Methods for Production Scale Girth Welding of High Strength Pipelines with Multiple Pipe Sources |
摘要: |
The goals of the proposed project are to: (1) test a large set of girth welds produced under realistic conditions by a state of the art high productivity gas metal arc welding (GMAW) system; (2) demonstrate the effect of material variability between pipes, between heats and between pipe manufacturers; and (3) validate current and proposed new weld defect assessment methods against the performance of a large set of welds made under field production conditions. |
状态: |
Completed |
资金: |
814071.00 |
资助组织: |
Pipeline and Hazardous Materials Safety Administration |
项目负责人: |
Kieba, Max |
执行机构: |
Electricore, Incorporated |
开始时间: |
20070701 |
实际结束时间: |
20110403 |
主题领域: |
Maintenance and Preservation;Pipelines |