SEISMIC: UW: Rapid Construction of Bridge Piers with Improved Seismic Performance
项目名称: SEISMIC: UW: Rapid Construction of Bridge Piers with Improved Seismic Performance
摘要: Construction projects inevitably disrupt traffic. When construction proceeds slowly, costs increases due to interruption of commerce and workers experience greater risk of injury. To mitigate these concerns for bridge design and construction this contract proposes to study the use of concrete-filled steel tube (CFT) bridge piers. The advantages of CFT bridge piers are hard to ignore if adopted: very rapid construction and the concrete inside the tube are protected from the environment.
状态: Active
资金: 384503.00
资助组织: California Department of Transportation
项目负责人: Lee, Peter S
执行机构: University of Washington, Seattle
开始时间: 20070701
实际结束时间: 20111201
主题领域: Bridges and other structures;Construction;Highways
相关文献
检索历史
应用推荐