原文传递 THE SECOND PENANG BRIDGE: SUSTAINABLE DESIGN, CONSTRUCTION AND OPERATION
题名: THE SECOND PENANG BRIDGE: SUSTAINABLE DESIGN, CONSTRUCTION AND OPERATION
正文语种: 中文
作者: Ismail bin MOHAME TAI
作者单位: Jambatan Kedua Sdn Bhd Kuala Lumpur, Malaysia
关键词: segmental box cable stayed bored pile spun pile earthquake no collapse high damping rubber bearing pylon thermal crack navigation span
摘要:   Jambatan Kedua Pvt.Ltd.(JKSB),a wholly-owned company of the Malaysia Minister of Finance,Incorporated (MoF Inc.) is the concessionaire for the Second Penang Bridge Project (PB2X).The bridge with estimated cost of RM4,5 billion is the longest in South-East Asia with a total length of 16,9 km over water.The construction of the Second Penang Bridge commenced in November,2008 and completed in February 2014.It has faced various challenges in applying sustainability to both design and construction.The Second Penang Bridge is pioneering in Malaysia to be fully designed for seismic load for a 475year return period earthquake and a 2500 year return period earthquake with 'no collapse' criteria.This paper will further discuss on the project management,the fast-track concept and innovation in the implementation of a sustainable bridge design,construction and operation.
会议日期: 20141023
会议举办地点: 上海
会议名称: 长大桥梁学术研讨会
出版日期: 2014-10-23
母体文献: 长大桥梁学术研讨会论文集