题名: |
Wreck Removal Project of"Hai Hong Da" at Changjiang Estuary |
正文语种: |
中文 |
作者: |
Zhang Honglin Xu Zhicheng Sun Jigang Peng Zhongwei Li Zhenhua |
作者单位: |
Shanghai Salvage Bureau, Shanghai, 200090 |
关键词: |
wreck removal shipwrecks lifting bottom sling penetration buoyancy calculation |
摘要: |
Wreck removal of"Hai Hong Da" is a comprehensive salvage project including underwater oil pumping, sling penetrating, splitting the shipwrecks by chain saw, lifting of the overall engine section into barge, fore section cargo removal by grab bucket and so on.This is the first time for Shanghai Salvage Co., to lift the whole engine section to a barge from seabed.This article reveals the shipwreck salvage plan;troubles encountered and remedy method during rigging slings penetration from bottom of shipwreck and lifting the shipwreck engine section as a whole.It provides a good teaching material for similar projects. |
会议日期: |
201409 |
会议举办地点: |
北京 |
会议名称: |
2014中国国际潜水、救捞与海洋工程技术论坛 |
出版日期: |
2014-08-31 |
母体文献: |
2014中国国际潜水、救捞与海洋工程技术论坛论文集 |