当前位置: 首页> 交通会议论文数据库 >详情
原文传递 Replacement of Two Railroad Bridges in Middletown, PA with the Use of Self Propelled Modular Transporters
题名: Replacement of Two Railroad Bridges in Middletown, PA with the Use of Self Propelled Modular Transporters
正文语种: 中文
作者: Adam Goossen
作者单位: UrbanTech onsulting Engineering, P
摘要:   This paper reviews the replacement of two railroad bridges in Middletown, PA.The bridges were built off site and transported to the final location via self propelled modular transporters (SPMT).The use of SPMTs along with modifications to the foundation design allowed the contractor to complete both bridge installations in a single 72 hour weekend, an improvement to the 3 week suggested construction schedule in the bid documents.
会议日期: 20150422
会议举办地点: 上海
会议名称: 第七届中国公路科技创新高层论坛
出版日期: 2015-04-22
母体文献: 第七届中国公路科技创新高层论坛论文集
检索历史
应用推荐