Ramp High Occupancy Vehicle (HOV) Project
项目名称: Ramp High Occupancy Vehicle (HOV) Project
摘要: Work will address the potential of ramp metering and the combination of ramp metering with parallel HOV by-pass lanes and associated support strategies. The project study area limits for the tasks covered are: IL Route 53 and I-290 between Lake-Cook Road and Austin Avenue to allow for an interface with the Eisenhower HOV lane proposal. The study will be conducted for both inbound and outbound traffic flows for both the AM and PM peak periods. The project's objective is to determine the effectiveness in terms of: reduced travel delay, value of travel time saved, fuel volume savings, fuel cost savings, reduced vehicle emissions, increased person throughput and traffic safety if this transportation demand and system improvement strategy were to be applied in the identified traffic corridors.
状态: Active
资金: 52000.00
资助组织: Chicago Metropolitan Agency for Planning<==>Northeastern Illinois Planning Commission
项目负责人: Vick, Tom
执行机构: University of Illinois, Chicago
开始时间: 20061204
实际结束时间: 20071231
主题领域: Highways;Operations and Traffic Management
检索历史
应用推荐