项目名称: |
The John A. Roebling Bridge - Phase 2: Load Capacity Evaluation |
摘要: |
The objective of this study is to determine an accurate load capacity of the historic John A. Roebling Bridge, located over the Ohio River at Covington-Cincinnati, and to make recommendations regarding future use in order to preserve the structure. |
状态: |
Completed |
资金: |
33750.00 |
资助组织: |
Kentucky Transportation Cabinet |
项目负责人: |
Byrd, Jamie |
执行机构: |
University of Kentucky, Lexington |
开始时间: |
20060901 |
实际结束时间: |
20071231 |
主题领域: |
Bridges and other structures;Construction;Highways;Research;I30: Materials |