December 2021 - The designer handed over to the National Railway Company CFR SA the feasibility study related to the second stage; December 2020 - PORR Construct has signed a design and build contract with the CFR; RON472mn (USD117.8mn) contract includes the restoration of four bridges, track works, repair of the signaling systems and rehabilitation of the station buildings