Guangzhou Metro Corporation[Operator]{China},China Railway 14th Bureau Group Co., Ltd[Construction]{China},China Construction 5th Engineering Division-CSCEC 5th Bureau[Construction]{China},China Railway Rolling Stock Corporation (CRRC)[Equipment]{China}
项目状态:
Completed
开始时间:
2010
结束时间:
2016
项目说明:
January 2017 - Project completed in December 2016; Construction on the Changsha-Zhuzhou-Xiangtan high-speed railway line began in September 2010; There are 21 stations on the line