Cross Island Line, Changi - Jurong Industrial Estate
国家和地区: Singapore
项目名称: Cross Island Line, Changi - Jurong Industrial Estate
领域: Metro
项目类型: -
项目性质: Public
项目经费 (USD Millions): -
规模: 50
规模单位: km
参加单位: Gammon Construction[Construction]{Hong Kong},Taisei Corporation[Construction]{Japan},Daewoo Engineering & Construction Company[Construction]{South Korea},Samsung Construction & Trading (Samsung C&T)[Construction]{South Korea},Dongah Geological Engineering[Construction]{South Korea},Sambo Engineering[Construction]{South Korea},Hock Lian Seng Infrastructure[Construction]{Singapore},Singapore Land Transport Authority[Sponsor]{Singapore},Woh Hup[Construction]{Singapore},Bachy Soletanche Singapore[Construction]{Singapore},BBR Holdings[Construction]{Singapore},ERM Power[Consultant/Project Management]{Australia},Sinohydro Corporation[Construction]{China},China State Construction Engineering Corporation (CSCEC)[Construction]{China},Shanghai Tunnel Engineering Co. Ltd.[Construction]{China}
项目状态: Contract Awarded
开始时间: -
结束时间: -
项目说明: February 2022 - Land Transport Authority (LTA) has awarded a SGD363mn (USD270.1mn) contract to a joint venture (JV) between Singapore Engineering & Construction and Sinohydro for the design and construction on Pasir Ris East Station as part of phase I of project; January 2022 - Design and construction of Serangoon North station and tunnels has been awarded to Hock Lian Seng Infrastructure Pte. Ltd. at a contract value of USD454mn; December 2021 - Contract awarded to Shanghai Tunnel Engineering and LT Sambo joint venture; November 2021 - Singapore's Land Transport Authority (LTA) has awarded two contracts with a combined value of SGD766mn (USD567mn) for the first phase of project to Hock Lian Seng Infrastructure and Nishimatsu Construction for design and construction of project; September 2021 - LTA has awarded a SGD748mn (USD557.1mn) civil contract to a joint venture between Woh Hup and Dongah Geological Engineering for the design and construction of Loyang station and tunnels for the first phase of the Cross Island Line; July 2021 - LTA has selected a joint venture between Gammon Construction and Engineering and Bachy Soletanche Singapore as the design build contractor for the Ang Mo Kio stations and tunnels under Phase I; April 2021 - LTA has awarded a SGD980mn (USD738.6mn) contract to a JV between Daewoo Engineering & Construction and Dongah Geological Engineering for carrying out civil works for a station and tunnels; March 2021 - Samsung C&T Corporation has won a SGD604mn (USD448mn) contract from Land Transport Authority for the design and construction of a rail station and tunnels under which Hougang Interchange Station and the associated tunnels is included; Land Transport Authority of Singapore has awarded a contract to design and build the 3.2 km bored tunnel between Aviation Park station and Loyang station for the Cross Island Line Phase I; July 2020 - Phase I and Cross Island Line Extension from Pasir Ris - Punggol are under planning stage; January 2019 - LTA has announce the alignment and station locations for Phase 1 of the line; October 2017 - Soil testing at the Central Catchment Nature Reserve almost completed; July 2014 - EIA study contract awarded to ERM; Line will be completed in 3 phases, of which Phase I will run from Aviation Park to Bright Hill and expected to be completed between 2020 and 2029; [B&R]
检索历史
应用推荐