项目名称: | SEISMIC: UCB: Determining Live Load Capacity of Bridges Designed to CalTrans Seismic Design Criteria Following a Major (Design) Seismic Event |
摘要: | No summary provided. |
状态: | Active |
资金: | 50000.00 |
资助组织: | California Department of Transportation |
项目负责人: | Whitten, Craig |
开始时间: | 20050701 |
实际结束时间: | 20100625 |
主题领域: | Bridges and other structures;Highways |