Soletanche Bachy[Construction]{France},TOA Corporation[Construction]{Japan},DP World[Operator]{United Arab Emirates},AECOM[Design/Architect]{United States}
项目状态:
Completed
开始时间:
2012
结束时间:
2014
项目说明:
January 2014 - Project completed; October 2012 - Construction commenced; Terminal is equipped with 19 highly automated quay cranes alongside the 1862 metre quay with a draft of 17 metres; Project cost - AED3.12bn