项目名称: |
Support for Implementation of TRANSIMS in Portland, Oregon and Estimation of Emissions Impacts of TRANSIMS Microsimulation |
摘要: |
This project has 9 tasks: (1) complete the Track 1 application in Portland and document the procedures and lessons learned from that implementation; (2) implement, Calibrate, validate, and document the GEN2 model in Portland; (3) identify issues in the Transportation Analysis Simulation System (TRANSIMS) modeling approach that could substantially affect the ultimate success of the project, and investigate ways these issues might be addressed before they critically impact the project schedule; (4) develop written materials that provide the basis for a wider understanding of the TRANSIMS implementations in Portland; (5) develop user inputs to involve the technical working group and other potential users in the TRANSIMS implementation process at METRO; (6) outreach to proactively provide the industry with information and insights regarding the technical aspects as well as the costs and benefits of implementing TRANSIMS; (7) to develop methods to synthetically generate a set of TRANSIMS activity and network files using traditional regional travel demand model data; (8) to compare TRANSIMS and MOBILE6 emission estimates to evaluate aggregation methods and procedures for integration methods and integration procedures identified by FHWA and EPA; (9) to develop a contracting mechanism to enable quick response to issues that arise during the course of the study. |
状态: |
Active |
资金: |
1402125.00 |
资助组织: |
Federal Highway Administration |
项目负责人: |
Gardner, Brian |
执行机构: |
AECOM Consulting Transportation Group |
开始时间: |
20050214 |
实际结束时间: |
20080215 |
主题领域: |
Highways;Operations and Traffic Management;I15: Environment |