Ministerio de Transporte de Colombia[Sponsor]{Colombia}
项目状态:
Under construction
开始时间:
2020
结束时间:
-
项目说明:
October 2021 - Construction underway; September 2021 - 94% work completed; July 2021 - Construction of the railway bridge completed; Project consists of construction of 4 kms of dual carriageway, the construction of a railway bridge (with a length of 508 meters) and the studies and designs to build a 1.5 km viaduct that borders the swamp; Project cost - COP168.28bn