项目名称: |
PPRC14 SPE 5.08: Document PaveM Traffic Updating Processes |
摘要: |
This task documents processes for updating traffic used in PaveM and in bridge and pavement design and implement them in PaveM. The study will also characterize truck traffic with unregulated loads for mechanistic empirical (ME) design for state highways near heavy load facilities. |
状态: |
Active |
资助组织: |
California Department of Transportation |
项目负责人: |
Wang, Yue |
执行机构: |
Regents of the University of California, Davis |
开始时间: |
20141001 |
预计完成日期: |
20171130 |
主题领域: |
Bridges and other structures;Design;Highways;Maintenance and Preservation;Pavements |