项目名称: |
Post Tensioned Box-Girder Deck Replacement Method |
摘要: |
A design and/or construction methodology is needed for the replacement of deteriorated post tensioned box girder decks without the reliance on falsework and while maintaining reduced traffic service on the bridge. The proposed solution shall be practical and implementable. |
状态: |
Active |
资助组织: |
California Department of Transportation |
项目负责人: |
Lee, Peter |
执行机构: |
Regents of the University of California, Davis |
开始时间: |
20140901 |
预计完成日期: |
20180531 |
主题领域: |
Bridges and other structures;Highways;Maintenance and Preservation |