Larsen & Toubro (L&T)[Construction]{India},Goa State Infrastructure Development Corporation Limited (GSIDC)[Operator]{India},TPF Engineering Pvt. Ltd[Consultant/Project Management]{India}
项目状态:
Completed
开始时间:
2014
结束时间:
2019
项目说明:
January 2019 - Bridge inaugurated; Construction began in July 2014; The cable-stayed part of the 5.1km long and 21m wide bridge is 620m long, the viaduct has a length of 3.3km and a width of 19.2 m; Project cost - INR8.6bn