Ramboll[Design/Architect]{Denmark},Implenia[Construction]{Switzerland},Porr[Construction]{Austria},Norwegian Public Roads Administration[Operator]{Norway},L2 Arkitekter AS[Design/Architect]{Norway}
项目状态:
Completed
开始时间:
2013
结束时间:
2018
项目说明:
April 2019 - Bridge opened in 2018; September 2016 - PORR and IMPLENIA have took over the construction work, replacing Bilfinger in autumn 2015; Contract worth NOK719mn (USD86mn) was awarded to Joint Venture Farris Bru ANS (Polish Bilfinger Infrastructure with 65% and German Bilfinger Constructions with 35%)