Anhui Province Traffic Holding Group Co Ltd[Sponsor]{China},CCCC Fourth Highway Engineering Co[Construction]{China}
项目状态:
Completed
开始时间:
2013
结束时间:
2017
项目说明:
December 2017 - Bridge opened for traffic; Construction was started in October 2013; Total length of the project is 55.5 km, of which the north shore is 20.7 km long, the south bank is 20.7 km long, the cross-river main bridge is 13.9 km long; Project Cost - CNY9bn