Development of Quality Assurance and Quality Control System for Post Tensioned Segmental Bridges in Florida: Case of Ringling Bridge - Phase 1 continuation
项目名称:
Development of Quality Assurance and Quality Control System for Post Tensioned Segmental Bridges in Florida: Case of Ringling Bridge - Phase 1 continuation
摘要:
The objective of this project is to develop Quality Assurance and Quality Control System for inspection of post tensioned segmental bridges in Florida. This is achieved by developing the procedure for prequalifying the consultant for carrying out nondestructive testing (NDT) of post tensioned tendons.
状态:
Completed
资金:
25640234.00
资助组织:
Florida Department of Transportation
项目负责人:
Lasa, Ivan
执行机构:
Florida International University
开始时间:
20140527
预计完成日期:
20160731
实际结束时间:
20160831
主题领域:
Bridges and other structures;Highways;I30: Materials