项目名称: |
Survey, Evaluation, and Long-Term Monitoring of the EDC GRS Abutment Performance for Multiple-Span CDOT Bridges Replacement Project |
摘要: |
The Colorado Department of Transportation's (CDOT's) project to replace the twin bridges over the Union Pacific Railroad and Smith Road incorporates innovations that implement the Colorado Department of Transportation/Federal Highway Administration (CDOT/FHWA) mandate - EDC GRS (Geosynthetic Reinforced Soil) abutment technology. These twin bridges carry I-70 eastbound and westbound traffic on three-span horizontally curved steel welded-plate girder structures. The mid-span piers are founded on deep foundation; however, the GRS abutments are supported by spread footings and founded on embankments. This unique feature of a GRS transition zone, to a GRS abutment founded on an embankment (shallow foundation), to pier (deep foundation) is a new design methodology for eliminating bridge bumps. The objective of this study is to validate the performance of GRS abutment for multi-span bridges and the use of geofabric without positive connections to the fascia blocks for GRS retaining walls. |
状态: |
Active |
资金: |
0.00 |
资助组织: |
Colorado Department of Transportation |
项目负责人: |
Khan, Aziz |
执行机构: |
Shannon & Wilson, Incorporated |
开始时间: |
20131018 |
实际结束时间: |
20151231 |
主题领域: |
Bridges and other structures;Geotechnology;Highways |