摘要: The Colorado Department of Transportation's (CDOT's) project to replace the twin bridges over the Union Pacific Railroad and Smith Road incorporates innovations that implement the Colorado Department of Transportation/Federal Highway Administration (CDOT/FHWA) mandate - EDC GRS (Geosynthetic Reinforced Soil) abutment technology. These twin bridges carry I-70 eastbound and westbound traffic on three-span horizontally curved steel welded-plate girder structures. The mid-span piers are founded on deep foundation; however, the GRS abutments are supported by spread footings and founded on embankments. This unique feature of a GRS transition zone, to a GRS abutment founded on an embankment (shallow foundation), to pier (deep foundation) is a new design methodology for eliminating bridge bumps. The objective of this study is to validate the performance of GRS abutment for multi-span bridges and the use of geofabric without positive connections to the fascia blocks for GRS retaining walls.
状态: Active
资金: 0.00
资助组织: Colorado Department of Transportation
项目负责人: Khan, Aziz
执行机构: Shannon & Wilson, Incorporated
开始时间: 20131018
实际结束时间: 20151231
主题领域: Bridges and other structures;Geotechnology;Highways