RES2013-12: Modeling Pollutant Loading from TDOT MS4 Stormwater Discharges
项目名称: RES2013-12: Modeling Pollutant Loading from TDOT MS4 Stormwater Discharges
摘要: Current environmental regulations require Tennessee Department of Transportation (TDOT) to develop and implement a stormwater management program (SWMP) characterize the contaminant of concern and reduce it to the extent practical for stormwater runoff from all portions of TDOT’s municipal separate storm sewer system (MS4) maintained within the State. Section 2.2 of the existing TDOT MS4 Permit requires TDOT to determine if stormwater discharges from the TDOT MS4 potentially impact impaired streams in any Total Maximum Daily Load (TMDL) regulated watershed. A TMDL evaluation is a study that quantifies the amount of a pollutant, identifies the sources, and recommends regulatory or other actions. Currently in Tennessee, over 1,200 impaired waterbodies have been evaluated in 109 separate TMDL evaluation documents. TDOT is required to characterize and map all of the stormwater outfalls and subsequently design and implement control measures. The overall cost to TDOT for TMDL regulated watersheds is estimated to be as much $15 million for sampling and mapping, and as much as $400 million for discharge control installations, representing a significant burden to TDOT. This project sought the development of an effective methodology to determine the relative pollutant contribution of TDOT MS4 to local watersheds through the modeling of pollutant loading from TDOT MS4 stormwater discharges. Results from this project were expected to help (1) rapidly identify critical watersheds with significant TDOT MS4 impact and prioritize these watersheds as targets for more focused characterization and mitigation, and (2) eliminate the need to study a majority of TDOT storm discharges with minor contributions to the overall pollutant loading, which would optimize resource allocation and maximize the environmental benefits of stormwater best management practices (BMP) implementation.
状态: Completed
资金: 181998
资助组织: Tennessee Department of Transportation
执行机构: University of Tennessee, Knoxville
开始时间: 20130601
预计完成日期: 20180531
主题领域: Environment;Highways;Hydraulics and Hydrology;Pavements
相关文献
检索历史
应用推荐