项目名称: |
Transportation System Performance Measurement Using Loop Signature Amplifiers (102-FH2-009) SBIR Phase II |
摘要: |
Phase II: (1) Developed basic simulation model based on open published algorithms and papers. (2) Developed C++ project to share data between operating programs. (3) Develop a server client architecture for programs. A phase II has been awarded. (4) Develop a database architecture for input output streams. (5) Develop architecture for handling multiple turning and auxiliary lanes. (6) Added linkage to coordinate cumulative and time interval measures of effectiveness with graphical files. |
状态: |
Active |
资金: |
749969 |
资助组织: |
Federal Highway Administration |
项目负责人: |
Gibson, David |
执行机构: |
CLR Analytics, Incorporated |
开始时间: |
20130420 |
预计完成日期: |
20150402 |
主题领域: |
Data and Information Technology;Highways;Operations and Traffic Management |