题名: |
Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods, Volume 3: Research Overview |
责任者: |
National Academies of Sciences, Engineering, and Medicine; Transportation Research Board; National Cooperative Highway Research Program; Keith R. Molenaar, Douglas Alleman, Allen Therrien, Kelly Sheeran, University of Colorado; Mounir El Asmar, Arizona State University; University of Arizona Dean Papajohn |
关键词: |
Transportation and Infrastructure ; Administration and Management Transportation and Infrastructure ; Design Transportation and Infrastructure ; Highways |
学科分类: |
公路工程 |
摘要: |
The use of alternative contracting methods (ACMs) has accelerated the delivery of highway design and construction projects. These changes came about through efforts of the Federal Highway Administration (FHWA) and state agencies over the last 30 years. The TRB National Cooperative Highway Research Program's NCHRP Research Report 939: Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods, Volume 3: Research Overview provides the necessary methods and tools to help state agencies better administer Design–Build (D-B) and construction manager–general contractor (CM-GC) contracts on highway construction projects. This Research Report documents the rigorous process followed to produce these two Guidebooks. Vol. 1, on design-build delivery, and Vol. 2, on construction manager–general contractor delivery, are also available. |
出版机构: |
Transportation Research Board |
参考文献: |
National Academies of Sciences, Engineering, and Medicine. 2020. Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods, Volume 3: Research Overview. Washington, DC: The National Academies Press. https://doi.org/10.17226/25692. |
总页数: |
257 |
报告类型: |
科技报告 |
资源类型: |
科技(咨询、行业)报告 |
初始创建时间: |
2020 |