项目名称: |
Revision of the Traffic Signal Design Guide and Timing Manual |
摘要: |
The objective of this project is to update the Alabama Department of Transportation (ALDOT) Traffic Signal Design Guide and Timing Manual to be consistent with the 2009 Manual on Uniform Traffic Control Devices (MUTCD), the Federal Highway Administration's (FHWA's) 2008 Signal Timing Manual, and current policies of the Alabama DOT. Upon release of the updated manual, two training sessions will be provided to review the revisions with ALDOT personnel. |
状态: |
Completed |
资金: |
45179.00 |
资助组织: |
Alabama Department of Transportation |
项目负责人: |
Barnett, Timothy |
执行机构: |
University Transportation Center for Alabama |
开始时间: |
20121019 |
实际结束时间: |
20140801 |
主题领域: |
Highways;Operations and Traffic Management |