Mid-Atlantic Truck Operations Study (MATOps) Phase I & II
项目名称: Mid-Atlantic Truck Operations Study (MATOps) Phase I & II
摘要: The goal of the Mid-Atlantic Truck Operations studies are to help state departments of transportation (DOT), metropolitan planning organizations (MPO), and motor carriers develop capital, operating, and regulatory solutions that reduce delays at highway truck bottlenecks, set priorities for project funding, and implement improvements. The work undertaken in the Mid-Atlantic Truck Operations Study (MATOps) Phase I study: (1) identifies 29 truck bottlenecks in the region, estimates the truck-hours of delay at each, and then develops detailed delay estimates for the five worst truck bottlenecks in each state; (2) describes the Mid-Atlantic economy, its growth industries, and commodities they ship and receive; (3) estimates the value and tonnage of the commodities caught in the truck bottlenecks as a proxy for the economic impact of the bottlenecks; (4) maps the commodity flows against truck freight bottlenecks and identifies "bottleneck strings" along the region's trade corridors; (5) reports Mid-Atlantic Truck Operations Study ES-2 I-95 Corridor Coalition current bottleneck reduction strategies; and (6) recommends actions that the Coalition and its member agencies can pursue as the next steps in reducing truck bottleneck delays. MATOps Phase II study will build on the work conducted in Phase I to further analyze the operational, physical and institutional issues impacting the identified bottlenecks and will, working with the states, identify strategies to mitigate these bottlenecks.
状态: Active
资金: 0.00
资助组织: I-95 Corridor Coalition
项目负责人: Schoener, George
开始时间: 20120510
主题领域: Highways;Motor Carriers;Operations and Traffic Management
检索历史
应用推荐