Examining the Use of Existing Public Rights-of-Way for High-Speed Rail or Other Infrastructure
项目名称: Examining the Use of Existing Public Rights-of-Way for High-Speed Rail or Other Infrastructure
摘要: The administrative difficulties, delays, costs, and environmental impacts associated with the acquisition of property for transportation projects point to a need to consider utilizing existing right-of-way (ROW) resources to the greatest extent possible. The primary purpose of this research work plan is to determine if and how existing Texas Department of Transportation (TxDOT), public, utility and freight rail ROW can potentially accommodate high-speed intercity passenger rail (HSIPR) and/or dedicated freight transportation systems. A number of states have considered and have chosen existing highway, public, freight rail, and utility ROW for preferred alignments for HSIPR, such as Florida (I-4, freight rail, utility, and Orlando airport ROW) and California (I-5, I-10, and freight rail). To answer the research question for Texas, all potential ROW routes in Texas will be identified and their key characteristics considered for utilization by a spectrum of HSIPR and dedicated freight systems. At least four of those routes will be evaluated in greater detail for technical, political, and legal feasibility. For those four case studies, the study will develop potential solutions to engineering challenges encountered in the ROW, such as highway interchanges and narrow ROW width. The case study research will include meetings and interviews with affected ROW owners and critical stakeholders.
状态: Completed
资金: 387943.00
资助组织: Texas Department of Transportation
项目负责人: Williams, Charon
执行机构: University of Texas, Arlington
开始时间: 20110913
实际结束时间: 20130831
主题领域: Data and Information Technology;Freight Transportation;Public Transportation;Railroads;Vehicles and Equipment
检索历史
应用推荐