Field Evaluation of Hybrid-Composite Girder Bridges in Missouri
项目名称: Field Evaluation of Hybrid-Composite Girder Bridges in Missouri
摘要: On August 11th, 2010 the allocation of $360,000 in Highways for Life funds was made for the use of Hybrid Composite Beams (HCB) on Route 97, over Sons Creek in Dade County, which is one of three bridge replacements comprising the Safe and Sound Bridge Improvement Program. These HCBs are comprised of three main sub-components, including: 1) a shell, 2) compression reinforcement, and 3) tension reinforcement. In the preferred embodiment, the shell is comprised of a fiber reinforced plastic (FRP) box beam. The compression reinforcement consists of cement or concrete, which is pumped into a profiled conduit within the beam shell. The tension reinforcement consists of carbon, glass or steel fibers anchored at the ends of the compression reinforcement. This study examines the field performance of these HCB members through in-situ monitoring and load testing over a two-year period. This study examines the field performance of these HCB members through in-situ monitoring and load testing over a two year period.
状态: Completed
资金: 39500.00
资助组织: Missouri Department of Transportation
开始时间: 20110624
实际结束时间: 20140630
主题领域: Bridges and other structures;Construction;Highways;I30: Materials
检索历史
应用推荐