原文传递 Behaviour during construction of a stablised base embedded wall at Coventry
题名: Behaviour during construction of a stablised base embedded wall at Coventry
责任者: Hayward, T,Carder, DR,Powrie, W,Richards, DJ,Barker, KJ
关键词: not available
学科分类: 公路工程
摘要: Instrumentation has been installed to monitor the behaviour of a bored pile retaining wall with a stabilising base during and after its construction of the Coventry North-South Road scheme in Warwickshire. Wall movements, wall and base bending moments, loads in the temporary props, and vertical pressures beneath the permanent stabilising base were monitored. In this report, the ground conditions, construction sequence and instrumentation are described and the field measurements during construction and its first two years in service are discussed. The results are compared with a finite element back-analysis and outline recommendations made for the design of similar structures in the future. (A)
出版机构: Transport Research Laboratory
提交日期: 1 January 2000
总页数: 26
报告类型: 科技报告
资源类型: 科技(咨询、行业)报告
初始创建时间: 1 January 2000
检索历史
应用推荐