Synthesis for Best Practices for Preventive Maintenance Preparatory Work
项目名称: Synthesis for Best Practices for Preventive Maintenance Preparatory Work
摘要: The synthesis study shall focus on pavement preparatory work performed before preventive maintenance (PM) surfacing contracts with the goal of answering, “What work needs to be performed to the roadway before a new surface is placed?” Preparatory work performed by in-house maintenance forces or maintenance contracts may include crack sealing, fog seal, repairs, milling, and level-up and should be performed well in advance of the PM contract. Both flexible and rigid pavements may require work in advance of a PM contract. Seal coats or thin overlays are typical PM surfacing projects. The synthesis shall investigate best practices, factors that affect materials selected, factors that affect repair decisions, timing of preparatory work and the effects of the repair procedures and materials on the life of the new surface based on the preparatory work performed.
状态: Active
资金: 64,612
资助组织: Texas Department of Transportation
项目负责人: Glancy, Chris
执行机构: Texas A&M Transportation Institute
开始时间: 20210901
预计完成日期: 20220831
主题领域: Construction;Maintenance and Preservation
检索历史
应用推荐