Post-fire Damage Assessment of Concrete Tunnel Liners
项目名称: Post-fire Damage Assessment of Concrete Tunnel Liners
摘要: The primary goal of this project is to research post-fire damage assessment of reinforced concrete tunnel liners and provide recommendations on damage assessment procedures for application in practice. The recommendations will cover the type of data to be collected after a fire event and how the data should be processed to assess tunnel safety. The intended outcome of the project is a set of recommendations on post-fire tunnel damage assessment using a holistic approach, including (a) post-fire residual mechanical properties of concrete based on the maximum temperature reached during the fire, (b) post-fire damage assessment using common non-destructive testing methodologies, (c) simulated residual deflections of a tunnel section as a function of soil type, and (d) input from experts consisting of stakeholders and researchers. The research team will incorporate input from stakeholders and practicing engineers to align the project outputs with real-world applications and maximize the impact. The project outcomes are not only relevant to post-fire damage assessment but can also be used as performance objectives when designing or evaluating tunnel structures using performance-based design methodologies for resilience against fire.
状态: Active
资金: 135568
资助组织: Office of the Assistant Secretary for Research and Technology
项目负责人: Capers, Harry;Szary, Patrick J
执行机构: University of Buffalo
开始时间: 20210201
预计完成日期: 20220131
主题领域: Bridges and other structures;Highways;Maintenance and Preservation;Security and Emergencies
检索历史
应用推荐