Cost/Benefit Analysis of Fuel Efficient Speed Control Using Signal Phasing and Timing (SPaT) Data: Evaluation for Future Connected Corridor Deployment
项目名称: Cost/Benefit Analysis of Fuel Efficient Speed Control Using Signal Phasing and Timing (SPaT) Data: Evaluation for Future Connected Corridor Deployment
摘要: This project will study the potential benefits to drivers of wider deployment of signal phasing and timing at intersections in Minnesota. What are typical eco-driving benefits? At what market penetrations of SPaT adaptive cruise control vehicles will the benefits justify the cost of instrumenting more SPaT corridors? Which corridors should be prioritized for SPaT deployment?
状态: Active
资金: 218,287.00
资助组织: Minnesota Department of Transportation
执行机构: University of Minnesota Department of Civil, Environmental and Geo-Engineering
开始时间: 20200810
预计完成日期: 20220731
主题领域: Operations and Traffic Management
相关文献
检索历史
应用推荐