项目名称: |
Design Guidelines for ABC Column-to-Drilled-Shaft Foundation Connections in High Seismic Zones |
摘要: |
The main objective of the research is to develop guidelines for the design of accelerated bridge construction (ABC) connections between precast columns and enlarged, cast-in-place drilled shafts in seismic regions. |
状态: |
Active |
资金: |
70000 |
资助组织: |
Accelerated Bridge Construction University Transportation Center (ABC-UTC)<==>Office of the Assistant Secretary for Research and Technology |
项目负责人: |
Eberhard, Marc |
执行机构: |
University of Washington, Seattle |
开始时间: |
20200101 |
预计完成日期: |
20210915 |
主题领域: |
Bridges and other structures;Construction;Design;Highways |