项目名称: |
Alternative Materials and Configurations for Prestressed-precast Concrete Pile Splice Connection |
摘要: |
The objective of this project is to explore alternative pile splice connection configurations and materials and to investigate the feasibility of these connections in comparison with the existing epoxy dowel splice for prestressed-precast concrete piles.
This research project focuses on the use of analytical modeling and computational means for investigation on the structural behavior for newly developed conceptual designs. Future activities, within a separate project, will include performing experimental verification of the newly developed details. |
状态: |
Active |
资金: |
60000 |
资助组织: |
Accelerated Bridge Construction University Transportation Center (ABC-UTC)<==>Office of the Assistant Secretary for Research and Technology |
项目负责人: |
Mehrabi, Armin |
执行机构: |
Florida International University |
开始时间: |
20200101 |
预计完成日期: |
20210701 |
主题领域: |
Bridges and other structures;Construction;Design;Highways |