SPR-4431: A New Approach to Accelerated Fabrication of Steel Bridges: Design, Optimization, and Demonstration
项目名称: SPR-4431: A New Approach to Accelerated Fabrication of Steel Bridges: Design, Optimization, and Demonstration
摘要: This project will develop and demonstrate a new approach to the accelerated fabrication of resilient steel bridges. Research objectives include: (1) Design and build a simply-supported and a multi-span continuous demonstration bridge; (2) Measure the dead and live load strains of the demonstration bridges as experimental evidence demonstrating behavior; and (3) Develop and optimize a kit-of-parts system to facilitate adoption.
状态: Active
资金: 189622
资助组织: Purdue University/Indiana Department of Transportation JHRP
开始时间: 20200101
预计完成日期: 20221231
主题领域: Bridges and other structures;Construction;Highways
相关文献
检索历史
应用推荐