原文传递 Developing a Systematic Approach for Determining Construction Contract Time
题名: Developing a Systematic Approach for Determining Construction Contract Time
责任者: Contributor(s): National Academies of Sciences, Engineering, and Medicine; Transportation Research Board; National Cooperative Highway Research Program; H. David Jeong; Kunhee Choi; Chau Le; MengWai Yaw; Yangtian Yin; Douglas D. Gransberg; Ali Touran; Nan Gao; Michael Rahgozar
关键词: Transportation and Infrastructure;Administration and Management Transportation and Infrastructure;Construction Transportation and Infrastructure;Economics Transportation and Infrastructure;Finance
学科分类: 暂无分类
摘要: Excessive contract time is costly because it extends a construction crew’s exposure to traffic, prolongs the inconvenience to the public, and subjects motorists to less than desirable safety conditions for longer periods. The TRB National Cooperative Highway Research Program's NCHRP Web-Only Document 298: Developing a Systematic Approach for Determining Construction Contract Timeseeks to provide a systematic approach for determining construction contract time for a wide spectrum of highway projects. The document is supplemental to NCHRP Research Report 979:Systematic Approach for Determining Construction Contract Time: A Guidebook.
出版机构: Transportation Research Board
参考文献: National Academies of Sciences, Engineering, and Medicine. 2022. Developing a Systematic Approach for Determining Construction Contract Time. Washington, DC: The National Academies Press. https://doi.org/10.17226/26536.
提交日期: 2022
总页数: 141
报告类型: 科技报告
资源类型: 科技(咨询、行业)报告