原文传递 Systematic Approach for Determining Construction Contract Time: A Guidebook
题名: Systematic Approach for Determining Construction Contract Time: A Guidebook
责任者: Contributor(s): National Academies of Sciences, Engineering, and Medicine; Transportation Research Board; National Cooperative Highway Research Program; H. David Jeong; Kunhee Choi; Chau Le; MengWai Yaw; Yangtian Yin; Douglas D. Gransberg; Ali Touran; Nan Gao; Michael Rahgozar
关键词: Transportation and Infrastructure;Administration and Management Transportation and Infrastructure;Construction Transportation and Infrastructure;Economics Transportation and Infrastructure;Finance
学科分类: 暂无分类
摘要: Contract time affects the cost of construction, traffic disruption and public inconvenience, the economic impact of projects to the surrounding areas, and schedule risks. The TRB National Cooperative Highway Research Program's NCHRP Research Report 979: Systematic Approach for Determining Construction Contract Time: A Guidebook provides state departments of transportation guidance for producing consistently credible, reliable, and defensible contract time estimates. Supplemental to the report is NCHRP Web-Only Document 298: Developing a Systematic Approach for Determining Construction Contract Time, a spreadsheet-based Toolkit, a Technical Memorandum, and a Presentation.
出版机构: Transportation Research Board
参考文献: National Academies of Sciences, Engineering, and Medicine. 2022. Systematic Approach for Determining Construction Contract Time: A Guidebook. Washington, DC: The National Academies Press. https://doi.org/10.17226/26537.
提交日期: 2021
总页数: 183
报告类型: 科技报告
资源类型: 科技(咨询、行业)报告
检索历史
应用推荐