题名: |
MULTIPERIOD HIGHWAY IMPROVEMENT AND CONSTRUCTION SCHEDULING: MODEL DEVELOPMENT AND APPLICATION. |
作者: |
ElDessouki-W; Rouphail-N; Beja-M; Ranjithan-SR |
关键词: |
HIGHWAY-IMPROVEMENTS; CONSTRUCTION-SCHEDULING; MATHEMATICAL-MODELS; MIXED-INTEGER-LINEAR-PROGRAMMING; OPTIMIZATION-; MODULES-; CASE-STUDIES; LISBON-PORTUGAL |
摘要: |
A methodology is presented that emulates the transportation improvement planning process using mathematical optimization techniques. The scheduling problem is formulated as a mixed integer linear program (MILP) and can be considered as a multiperiod network design problem. The three primary model components are discussed: (a) the input module in which the network, traffic demand, and pool of potential projects are identified over the planning horizon; (b) the benefits estimation module using network travel time as the benefit criterion; and (c) the schedule builder, an MILP that attempts to maximize the total benefits subject to annual resources and project precedence constraints. The proposed method is applied in a case-study context to the Lisbon metropolitan region's network, a portion of Portugal's highway network, and the results are discussed. |
总页数: |
Transportation Research Record. 1998. (1617) pp96-104 (8 Fig., 2 Tab., 16 Ref.) |
报告类型: |
科技报告 |