题名: |
MAINSTREAMING ITS INTO A REGIONAL TRANSPORTATION PROGRAM : THE MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION ITS MAINSTREAMING PROCESS. |
作者: |
Fowler-Thomas-M; Ward-Bruce-G |
关键词: |
Intelligent-transportation-systems; Planning-; Transportation-buildings; Transportation-facilities |
摘要: |
In an effort to mainstream ITS infrastructure elements into their Transportation Improvement Program (TIP), the Maricopa County Department of Transportation (MCDOT) and Kimley-Horn and Associates have developed an ITS mainstreaming procedure. Maricopa County reviews TIP projects at three phases: Candidate Assessment Reports, Design Concept Reports, and TIP Design Projects. At each level the project is developed in greater detail and must be approved by MCDOT and their Board of Supervisors to move to the next level. To successfully mainstream ITS infrastructure into the County TIP, ITS infrastructure elements must be included in a projects Candidate Assessment Report along with other infrastructure elements, such as drainage improvements, sidewalk construction, and pavement overlay. Projects in the Candidate Assessment Report phase compete against each other for funding and a limited number move to the Design Concept Report phase. At the Design Concept Report phase, projects are refined and preliminary designs are developed. Under the ITS Mainstreaming Procedure, ITS infrastructure is also refined and specific technologies are determined. |
总页数: |
ITS America. Meeting (10th : 2000 : Washington, D.C..). revolutionary thinking, real results : ITS 2000 : conference proceedings. 2000. pp19 |
报告类型: |
科技报告 |