题名: |
Development of a Utility Production Rate Scheduling Reference for FDOT Construction Projects; Draft Final rept |
作者: |
Ellis, R.; Shannon, J. W.; Johnson, M. S. |
关键词: |
Highway transportation; Florida; Construction projects; Production; Scheduling; Utilities; Relocation |
摘要: |
FDOT scheduling engineers need a reliable reference for estimating the duration of different utility relocations encountered on FDOT construction projects. The type of utility work involved on a project may vary considerably. FDOT projects can involve everything from fiber optic systems to conventional storm drainage, often with many different utility systems involved in a single project. Currently the FDOT does not have a comprehensive information base for estimating utility production rates and activity duration. This report first determines common utility relocation activities from a sampling of FDOT relocation schedules. This list was then verified by FDOT district utility engineers. Next, the research team compared the utility relocation schedules data to data obtained from different utility companies and means manuals. Overall, the relocation schedules are generally an accurate reflection of the time needed to relocate utilities in FDOT construction projects. However, more information and assistance is needed from the different utility industries in order to fully verify information acquired from the relocation schedules. |
总页数: |
114p |
报告类型: |
科技报告 |