项目名称: |
COMPARATIVE STUDIES OF THE PTFE/POM-HGW AND PTFE/EST SLIDING COUPLES IN THE POINT TIPPING SLIDING BEARINGS OF THE LAHN BRIDGE AT ESELSWIESE (ON THE GIESSEN RING ROAD WEST) |
摘要: |
THE BEARINGS WHICH WERE MADE BY THE FIRM KREUTZ, ERKRATH, AND INCORPORATED INTO THE STEEL STRUCTURE OF THE LAHN BRIDGE, HAVE NOW BEEN SUBJECTED TO TRAFFIC LOADING FOR 6 YEARS. TO OBTAIN INFORMATION ON THE WAY THEY HAVE WORN AND THEIR LONG TERM BEHAVIOUR, THE BEARINGS ARE BEING DISMANTLED AND TESTED IN THE MATERIALS TESTING LABORATORY AT STUTTGART. |
状态: |
Active |
资助组织: |
BUNDESMINISTER FUER VERKEHR (FEDERAL MINISTER OF TRANSPORT) |
项目负责人: |
HAKENJOS |
执行机构: |
STAATLICHE MATERIALPRUEFUNGSANSTALT, UNIVERSITAET (TH) STUTTGART (STATE MATERIALS TESTING INSTITUTE AT THE UNIVERSITY OF STUTTGART)<==>HESSISCHES LANDESAMT FUER STRASSENBAU (STATE ROAD OFFICE OF HESSEN) |
开始时间: |
19780000 |
预计完成日期: |
19790000 |
主题领域: |
Bridges and other structures;I24: Design of Bridges and Retaining Walls |