项目名称: |
PROCEDURE FOR THE LIMITING LINE METHOD WITHIN THE CONTEXT OF THE AUSTRIAN SPECIFICATIONS FOR ELECTRONIC CALCULATION FOR CONSTRUCTION |
摘要: |
IT IS PROPOSED TO DEVELOP A PROCEDURE FOR QUANTIFYING EARTHWORKS ON LONG SECTIONS OF ROADS, RIVERS AND CANALS UNDER CONSTRUCTION FROM CROSS SECTION SURFACES IN SECTIONS WITH GIVEN POSITIONING. IN THE TRANSVERSE PROFILES LIMITING LINES ARE FORMED AS SEQUENCES OF POINTS OF THE LIMITS OF A SOIL TYPE, I.E. ORIGINAL TERRAIN, ROCK, PLANUM OR STRUCTURE (NORMAL SECTION). |
状态: |
Completed |
资助组织: |
STUAG STRASSEN- UND TIEFBAUUNTERNEHMUNG AG<==>BUNDESMINISTERIUM FUER BAUTEN UND TECHNIK |
项目负责人: |
OBERNDORFER, W |
执行机构: |
STUAG STRASSEN- UND TIEFBAUUNTERNEHMUNG AG (STUAG ROAD AND CONSTRUCTION ENGINEERING CO) |
开始时间: |
19770000 |
实际结束时间: |
19780000 |
主题领域: |
Research;I10: Economics and Administration |