TORONS GAINES GRAISSES
项目名称: TORONS GAINES GRAISSES
摘要: EN PRECONTRAINTE EXTERIEURE AU BETON, UN DETENTEUR DE PROCEDE DE PRECONTRAINTE A EU L'IDEE D'UTILISER DES TORONS GAINES GRAISSES PLACES DANS UN CONDUIT EN POLYETHYLENE HAUTE DENSITE (PEHD). AVANT LA MISE EN TENSION UNITAIRE DE CHACUN DES TORONS GAINES GRAISSES, L'ESPACE ENTRE LE CONDUIT ET LE GAINAGE DE CHAQUE TORON EST INJECTE DE COULIS DE CIMENT AFIN DE FIGER LA POSITION DES TORONS. LES EXPERIENCES IN-SITU MONTRENT DES DEVIATIONS DU CONDUIT EXTERIEUR AVANT MISE EN TENSION ; A LA FIN DE LA MISE EN TENSION, LE CONDUIT, ENTRE CHAQUE DEVIATEUR, PREND UNE FORME RECTILIGNE. L'OBJECTIF DE CETTE FICHE NOUVELLE VISE, AU MOYEN D'ESSAIS APPROPRIES SUR BANC D'ESSAIS, A EXPLIQUER LE PHENOMENE : EN PARTICULIER LA FIXATION PREALABLE DE LA POSITION DES TORONS NE GENERAIT-ELLE PAS DES DEVIATIONS PARASITES DONC DES FROTTEMENTS SUPPLEMENTAIRES. (FAIT SUITE A L'AER 1.42.01.4, DIRR 501484).
资金: 0.00
资助组织: MINISTERE DE L'EQUIPEMENT, DU LOGEMENT, DES TRANSPORTS ET DE LA MER (MINISTRY OF PUBLIC WORKS, HOUSING, TRANSPORT AND SEA MATTERS)
项目负责人: AMBROSINO, R
执行机构: LABORATOIRES DES PONTS ET CHAUSSEES (PUBLIC WORKS RESEARCH LABORATORIES)
开始时间: 19880000
主题领域: Maintenance and Preservation;Research;I24: Design of Bridges and Retaining Walls;I53: Construction of Bridges and Retaining Walls
检索历史
应用推荐