项目名称: |
Best Practices for MOT on Interstate Pavement Rehabilitation Projects |
摘要: |
On interstate pavement rehab projects, the Kentucky Transportation Cabinet (KYTC) often finds it challenging to maintain two lanes of traffic in each direction. The standard practice is to use a full-width shoulder as a thru lane while work is done on adjacent lanes. But difficulties arise when the shoulder is not wide enough to operate as a thru lane — particularly when the required depth for rehabilitation demands more lateral clearance for lanes under construction. Designers can also face maintenance of traffic (MOT) challenges at interchanges due to the widths of mainline bridges, lateral clearances of cross-road structures, and ramp lengths. Researchers will review ongoing and completed interstate rehab projects where KYTC found it challenging to maintain desired lane widths during construction and document negative impacts of MOT on completed facilities.
The objective of this study is to develop best practices for MOT to help Project Managers mitigate risks on pavement rehab projects. |
状态: |
Active |
资金: |
120000 |
资助组织: |
Kentucky Transportation Cabinet |
执行机构: |
University of Kentucky, Lexington |
主要研究人员: |
Jasper, Jeff;Catchings, Rachel |
开始时间: |
20220701 |
预计完成日期: |
20230630 |
主题领域: |
Construction;Highways;Maintenance and Preservation;Operations and Traffic Management |