Steel Bridge Coating and Recoating Warranty Requirements
项目名称: Steel Bridge Coating and Recoating Warranty Requirements
摘要: The objective of the project is to develop draft contract language for steel bridge coating and recoating warranty contracts that will improve the quality and durability of steel bridge coatings. Determine contract performance measures that will fairly and accurately evaluate the longevity of coating systems. Recommend a warranty period that will protect the owner’s investment and optimize the cost of bonding. The goal is to reduce the number of times bridges need to be recoated during their service lives due to the coating systems not achieving their anticipated service life. The use of warranties will impose financial responsibilities on contractors, thus encouraging higher quality work. The result will be significant savings, as each recoating involves costly items including mobilization, traffic control, containment, disposal, surface preparation, coating application, and user costs.
状态: Active
资金: 199744
资助组织: Florida Department of Transportation
管理组织: Florida Department of Transportation
项目负责人: Padilla, Felix
执行机构: KTA -Tator, Inc
主要研究人员: Ault, Peter
开始时间: 20220125
预计完成日期: 20240131
主题领域: Administration and Management;Bridges and other structures;Highways;Materials
检索历史
应用推荐