Rapid Post-Earthquake Displacement-Based Assessment Methodology for Bridges Phase I
项目名称: Rapid Post-Earthquake Displacement-Based Assessment Methodology for Bridges Phase I
摘要: This project aims to develop a rapid seismic bridge assessment method that can be used for planning (via scenarios), and for post-earthquake assessment (inspection prioritization). Unlike existing methods which are largely probabilistic, and focused on high level assessment, the proposed methodology is sufficiently versatile that it can provide a range of information, spanning from deterministic bridge specific performance, to probabilistic assessments of bridge vulnerability. With more detailed information, the uncertainty in the resulting outcome is expected to be reduced significantly. Tasks for this project will include a literature review, evaluation of limit state parameters, seismic hazard characterization for rapid assessment in Alaska, implementation plan for Phase 2, and a final report and recommendations.
状态: Active
资金: 316536
资助组织: Federal Highway Administration
管理组织: Alaska Department of Transportation and Public Facilities RD&T2
项目负责人: Moller, Shane<==>Bosin, Anna
执行机构: North Carolina State University, Raleigh
主要研究人员: Kowalsky, Mervyn J
开始时间: 20220101
预计完成日期: 20241231
主题领域: Bridges and other structures;Highways;Maintenance and Preservation
检索历史
应用推荐