当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 Fall Project To Complete Levee System
题名: Fall Project To Complete Levee System
正文语种: eng
作者: SHELLEY BYRNE
摘要: The Memphis Engineer District expects to complete a levee system along the Mississippi River in far western Kentucky and northwest Tennessee within in a little more than two years as work gears up on the final project to control seepage. The district, in partnership with the Fulton County Board of Levee Commissioners, finished two maintenance projects in April: the Island 8 Parcel 1 Relief Well Ditch Restoration Project and the Lake No. 9 Collector Ditch Erosion Repair Project, both located along the Mississippi River Mainline Levee south of Hickman, Ky. That allows the district to move on to the final project, the Island 8 Parcel 2 Seepage Remediation Project, project manager Ken Bright said. The project is within the Hickman, Ky.-Obion River Levee System, part of the overall Mississippi River Levees project. The Hickman, Ky.-Obion River Levee System extends south from Hickman to the mouth of the Obion River. The system includes a line of levees that work together to prevent flooding in the 62.2-mile system, Bright said.
出版年: 2021
期刊名称: The Waterways Jouranl
卷: 135
期: 5
检索历史
应用推荐