摘要: |
On 31 August 2009, APR Consultants, Inc. (APR) traveled to the Avon Park test range to measure and assess 13 lines of survey in two sections of Runway 05-23. Using APR's Auto Rod and Level(TM) profiling device (AR&L), nine lines of survey were measured in the area designated as Test Section 1, and an additional four lines of survey were measured in the area designated as Test Section 2. All of these profile measurements were compared to the baseline measurements conducted in July 2009 (prior to the crater exercise). The before and after measured profile data used in the analyses have been emailed to the Air Force POC for this project. The July baseline data was emailed in July. The September data was emailed on 9 September 2009. This report compares the July 2009 (baseline) profiles to the September 2009 profiles (after expedient crater repairs). |